- Tag
- cat
-
Date Range
- Last Day (0)
- Last Week (0)
- Last Month (0)
- Last Year (4)
-
Author
- staff (5)
- cindy brauer (4)
- mike antich (3)
- Type
-
Website
- automotive-fleet.com (17)
- metro-magazine.com (13)
- chargedfleet.com (11)
- government-fleet.com (1)
- worktruckonline.com (1)
-
Group
- Automotive (43)
- Image
-
Sponsored
- false (43)
- Canonical
-
Featured
- false (43)
As Caltrain approaches the first anniversary of the launch of electric service, the agency continues to show strong ridership growth.
https://www.metro-magazine.com/10247218/californias-caltrain-hits-1m-plus-riders-for-3rd-month-in-a-row
Across North America, transit agencies are under growing pressure to electrify their fleets. Local and state mandates are driving the transition, and public...
https://www.metro-magazine.com/10244851/smarter-strategies-for-transit-fleet-electrification
Across North America, transit agencies are under growing pressure to electrify their fleets. Local and state mandates are driving the transition, and public...
https://www.chargedfleet.com/10244851/smarter-strategies-for-transit-fleet-electrification
The firm will provide quality assurance, engineering, and administrative services for Metra’s $154 million base order for eight battery-powered trainsets.
https://www.metro-magazine.com/10236095/stv-to-help-chicagos-metra-procure-battery-powered-trainsets
After an extensive competitive procurement process, joint venture SYSTRA | TYPSA was awarded the contract with today’s board action.
https://www.metro-magazine.com/10224017/california-high-speed-rail-approves-contractor-to-design-of-track-overhead-elect
EO will be providing its Full Fleet Electrification, comprising of hardware, software, and ongoing operation and maintenance services.
https://www.metro-magazine.com/10223633/ill-s-metrolink-taps-eo-charging-to-install-ev-infrastructure
EO will be providing its Full Fleet Electrification, comprising of hardware, software, and ongoing operation and maintenance services.
https://www.chargedfleet.com/10223633/ill-s-metrolink-taps-eo-charging-to-install-ev-infrastructure
The testing will allow the agency to ramp up the testing of the new fleet as the launch of electrified service this fall grows closer.
https://www.metro-magazine.com/10217942/caltrain-continues-to-successfully-test-electric-trains
The service improvements are possible because Caltrain is replacing all the aging diesel trains between San Francisco and San Jose with electric trains that...
https://www.metro-magazine.com/10212014/caltrain-unveils-service-increases-new-amenities-for-electric-service
The milestone signifies major progress in expanding Caltrain’s ability to test and run electric trains along the corridor.
https://www.metro-magazine.com/10205462/caltrain-partners-celebrate-energization-of-2nd-traction-power-substation